Example 1

A construction cmpany has four large bulldozers located at four different garages. The bulldozers are to be moved to four different contruction sites. The distances in miles between the bulldozers and contruction sites are gicen in the following Table.


Construction site Construction #1 Construction #2 Construction #3 Contruction #4
Bulldozer #1 90 75 75 80
Bulldozer #2 35 85 55 65
Bulldozer #3 125 95 90 105
Bulldozer #4 45 110 95 115


How should the bulldozer be moved to the contruction sites in order to minimum total distance traveled?



 